Building Errors

Click on image to enlarge

click image to enlarge

In this photo, a plumber cut the top flange on this engineered floor joist. With the floor joists paced 24 inches on center, and with the concentrated load of a toilet above. This was an accident waiting to happen. In order to solve this problem, an engineer from the floor joist manufacturer was contacted to design a fix.

Click on image to enlarge

click image to enlarge

This is an example of a contractor countersinking the foundation anchor bolts in to the mudsill. The mudsill is the point of attachment for the exterior wall framing, and with better then half of the wood missing. This weakens the hold down of the foundation anchor bolt.

Click on image to enlarge

click image to enlarge

The flange on this engineered floor joist was cut and weakened the joist.

Click on image to enlarge

click image to enlarge

Another example of the flange on an engineered floor joist product being cut.